2021 Pavement Repair Project

In general, the work to be performed consists of mobilization, traffic control, site cleanup, cold-in-place recycling, asphalt concrete removal, asphalt concrete installation, ADA ramp construction, AC berm removal & replacement, PCC curb & gutter removal and replacement, PCC sidewalk removal and replacement, PCC driveway construction, utility cover lowering & restoring to grade, survey monument reinstallation, bollards installation, striping and marking removal & replacement, and all other work as shown on the Plans, called for in the Technical Provisions and as directed by the Engineer.