John Muir Parkway Traffic Calming Improvements Project
The Project is located on John Muir Parkway in the City of Hercules, between Bayfront Boulevard and Alfred Nobel Drive, and is generally described as follows: traffic control, crack seal, slurry seal treatment (add alternate), traffic calming features, bike lane and pavement striping, traffic sign installation, radar speed feedback signs, and all other work as shown on the Plans (including any additive alternate work that the City may choose to incorporate into the Project), called for in the Technical Specifications, or as directed by the Engineer.
Plan Holders
| Date | Company | Contact |
| 12/11/25 8:58 am |
Bay Area Builders Exchange
3055 Alvarado Street
San Leandro, CA 94577 |
Jeannie Kwan
Plan Room Coordinator
Tel: 510-483-8880
Fax: 510-352-1509
|
| 12/11/25 8:58 am | Bid Net |
Plan Room
|
| 12/11/25 8:58 am |
Builders Exchange of Santa Clara
400 Reed Street
Santa Clara, CA 95050 |
Kanani Fonseca
Tel: 408-727-4000
|
| 12/11/25 8:58 am |
ConstructConnect
30 Technology Pkwy., South
#100 Norcross, GA 30092 |
CMD/iSq Ft Constructconnect
Tel: (800) 699-8640
|
| 12/11/25 8:58 am |
Dodge Data & Analytics
2860 S State Hwy 161
Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Other
Tel: 413-376-7032
Fax: 609-336-2767
|
| 12/16/25 12:09 pm |
Ghilotti Construction Company, Inc.
246 Ghilotti Avenue
Santa Rosa, CA 95407 |
Annette Conley
Estimating Administrator
Tel: (707) 585-1221
Fax: (707) 585-1601
|
| 12/11/25 8:58 am |
Marin Builders Exchange
660 Las Gallinas Avenue
San Rafael, CA 94903 |
000 Plan Room
Tel: 415-462-1220
|
| 12/11/25 8:58 am |
Valley Contractors Exchange
951 8th ST.
Chico, CA 95928 |
Elizabeth Carter
Tel: 530-343-1994
|

